Over-weight pipe eating margin
Actual weight per metre is recorded against the standard for each size and class, so material given away is visible per shift.
PVC, uPVC, HDPE and CPVC pipes and fittings
Built for plastic pipe and fittings plants, from resin and additive receipt through compounding, extrusion, sizing, cutting, socketing and testing to bundled dispatch, with batch-wise test records, weight per metre control and distributor orders.

Plastic pipe ERP is business software built around how a pipe plant runs. Formezy records the resin and additive lots in each compound batch, extruder output and stoppages per shift, actual weight per metre against the standard, test results for each production batch and the bundles or coils dispatched to distributors, so stock, material use, cost and quality stay current.
Actual weight per metre is recorded against the standard for each size and class, so material given away is visible per shift.
Dimension, pressure and other test results are recorded per production batch, and the batch is held until it passes.
Distributor orders, schemes and dispatches run on the same stock, so the plant and sales see the same numbers.
Segments
3 segments, each with its own shop-floor process flow.
Rigid PVC and uPVC pipes for water supply, plumbing, drainage, agriculture and casing. Compound recipes, extruder output, weight per metre and batch tests tracked.
See the 7-step flowPE80 and PE100 pipes and coils for water supply, gas distribution, irrigation and ducts. Masterbatch dosing, weight per metre and coil lengths recorded per batch.
See the 7-step flowCPVC pipes for hot and cold water, and injection-molded PVC and CPVC fittings. Moulds, cavities, shot counts and size-wise packing tracked.
See the 7-step flowShop-floor process flow
Choose a segment, then a step. Each one shows what happens on the shop floor, what Formezy records, and what changes as a result.
PVC resin, stabiliser, filler, lubricants and pigments received
GRN posts grade, supplier lot no. and weighbridge weight; bags labelled with a lot barcode
Weight Integration moduleEvery input lot traced
Dry blend mixed in hot and cold mixers to the formulation
Formulation issued; batch weights booked against the lots used
Production & Purchase moduleCompound cost per batch
Compound extruded, vacuum sized and cooled
Downtime reasons on record
Pipe printed, cut to length and belled or socketed
Lengths and actual weight per metre logged against the standard
Weight Integration moduleOver-weight pipe visible
Dimensions, hydrostatic pressure and other tests to the applicable standard
Only passed batches dispatched
Quality gate. If it fails: hold the batch and send rejects to regrind.
Pipes bundled by size and class
Bundle-wise stock
Bundles loaded for distributors and projects
No paperwork chase
PVC resin, stabiliser, filler, lubricants and pigments received
GRN posts grade, supplier lot no. and weighbridge weight; bags labelled with a lot barcode
Weight Integration moduleEvery input lot traced
PE compound or natural resin and black masterbatch received
GRN posts grade, supplier lot no. and weighbridge weight; bags labelled with a lot barcode
Weight Integration moduleResin lot traced
Masterbatch dosed into the resin to the recipe
Recipe issued; resin and masterbatch consumed per batch booked
Production & Purchase moduleRecipe followed per batch
Pipe extruded, vacuum sized and cooled
Output per line, live
Pipe marked with size, class and batch
Material per metre controlled
Pipe coiled or cut to straight lengths
Coil-wise stock
Dimensions, ovality, pressure and material tests
Only passed batches dispatched
Quality gate. If it fails: hold the batch and send rejects to regrind.
Coils and lengths loaded against the order
Order-wise dispatch
PE compound or natural resin and black masterbatch received
GRN posts grade, supplier lot no. and weighbridge weight; bags labelled with a lot barcode
Weight Integration moduleResin lot traced
CPVC or PVC compound and masterbatch received
GRN posts grade, supplier lot no. and weighbridge weight; bags labelled with a lot barcode
Weight Integration moduleCompound lot traced
Fitting mould loaded on the injection machine
Changeover time visible
Fittings molded shot by shot
Shots, cycle time and output per machine captured; mould shot count updated
IoT & Automation moduleOutput vs. plan, live
Runners removed and fittings trimmed
Scrap weighed, not guessed
Dimensions, fit and pressure tested on samples
Only passed fittings packed
Quality gate. If it fails: hold the batch and send rejects to regrind.
Fittings counted into bags and cartons by size
Size-wise finished stock
Cartons loaded for distributors and dealers
Distributor orders on time
CPVC or PVC compound and masterbatch received
GRN posts grade, supplier lot no. and weighbridge weight; bags labelled with a lot barcode
Weight Integration moduleCompound lot traced
Dashed ring marks a quality gate, where failed material is held before it moves on.
Capabilities
Open an area to see what it covers.
Questions
Talk to a plastic ERP specialist about your own plant and process route.
Formezy supports PVC & uPVC pipes, HDPE pipes and CPVC pipes & fittings, each with its own process flow. Plants that combine segments run them in one system.
PVC and uPVC pipes, HDPE pipes and coils, CPVC pipes and injection-molded fittings, each with its own process flow. Plants making pipes and fittings run them in one system.
Yes. The standard weight per metre is set for each size and class, and actual weights are recorded during production, so over-weight pipe and the extra material it uses are visible per line and shift.
Formulations list each ingredient, such as resin, stabiliser, filler, lubricant and pigment. Each mixer or dosing batch is booked against the lots used, so material consumption and cost per batch come from actual weights.
Yes. Dimension, pressure and other test results are recorded per production batch against the parameters for that product, and batches can be held until they pass.
Yes. Distributor orders, stock, dispatches and payments are managed in the CRM and Sales module, with performance reports by distributor.
Subsidy and incentive claims can be recorded and tracked with their status alongside the related records.
Other industries
See Formezy configured around your own process route, from receipt to dispatch.